Carry out road repairs while traffic is reduced
It is apparent from the number of areas marked up in our local area that the Council was planning a programme of road repairs and patching before the lock down. This has all come to a stop. Provided a safe method of working is established, the repairs should be carried out while the traffic levels are at their reduced levels.
Why the contribution is important
With less traffic, it would be a safer work space for the workforce
It would cause less inconvenience to the travelling public
It would cause less inconvenience to the travelling public
by Paul_Rimmer on May 07, 2020 at 12:41PM
Posted by ABusby May 07, 2020 at 15:39
Report this Comment (Requires Log In)
Posted by markymalarky May 07, 2020 at 16:16
Report this Comment (Requires Log In)
Posted by Mars May 07, 2020 at 22:03
Report this Comment (Requires Log In)